Article 11 | Mid-Process Review Milestone
(1) Purpose and Dual-Track Approach: This Article establishes a streamlined review milestone to evaluate progress, eliminate operational bottlenecks, and maintain agile momentum across OpenBharat.net Working Groups (OWGs). To prevent bureaucratic drag, this milestone distinguishes between:
Direct Standardisation Tracks: Structured deliverables intended to produce formal open specifications, canonical benchmarks, or regulatory standards; and
Ecosystem and Exploratory Tracks: Non-standard deliverables, including foundational research memos, empirical diffusion pilots, open codebases, developer tooling, hardware testbeds, and policy sandboxes.
(2) Timing and Trigger: The mid-process review is an agile checkpoint rather than a rigid procedural barrier. It may be initiated:
For Direct Standardisation Tracks, at approximately the midpoint of the timeline established under Article 5; or
For Ecosystem and Exploratory Tracks, flexibly upon reaching a functional code milestone, completion of an initial empirical sprint, or at the joint discretion of the presiding Convenors and the OBGC.
(3) Milestone Objectives: The review aims to:
Assess tangible output (such as codebase stability, benchmark empirical viability, or draft normative text);
Identify and clear architectural, compute, or legal roadblocks early without halting parallel work;
Ensure pragmatic synthesis of technical contributor feedback and empirical findings; and
Verify contextual alignment with the technical, commercial, legal, and ethical imperatives set out in Schedule 1 of this Charter.
(4) Streamlined Review Modality: The review shall be conducted via routine sprint sessions or virtual working reviews presided over by the track Convenors. Participants may:
Triage open repository issues, technical pull requests, or drafting comments;
Decide whether an exploratory track has matured sufficiently to spin off into a formal standardisation track under Article 5;
Resolve any licensing or upstream dependency conflicts pursuant to Article 6; and
Recalibrate sprint delivery targets where experimental conditions or compute limitations warrant flexibility.
(5) Milestone Briefing and Documentation:
To eliminate excessive reporting burdens, the requirement for a formal mid-process review report is satisfied by a concise Milestone Briefing or committed Sprint Summary Memo prepared by the track Convenor and transmitted to the OBGC.
The briefing may briefly summarize:
Key technical progress and operational readiness of the deliverable;
Critical dependencies, compute bottlenecks, or statutory considerations requiring council support; and
Recommended sprint targets, revised release timelines, or immediate next steps.
Once noted by the OBGC, the briefing shall be logged in the track repository, ensuring transparent alignment across participating Academic Members and ecosystem contributors without disrupting development workflows.